- Inner and outer harbours will not be dredged but there will be dredging required to create the new navigational channel.
- All material will be retained on site for the new beach and the extended boat storage area.
- Only rocks will need to be brought into the site. Estimated to be around five months of traffic movement to bring in the rocks.
- Will use silt barriers to contain dredged material.