Breakwater Reaches Halfway Mark
Nanny Cay has reached the halfway mark on the construction of its breakwater for the new 112-slip south marina designed to accommodate the latest generation of catamarans and megayachts. To date, 34,209 tons of rock has been used in the construction to reach the first 715 feet of the 1430-foot (435m) long breakwater.